Our K St building is block construction with 12′ ceiling and dock door. It is available July 1st. It has gas heat, 3 phase power, and a central air system in place
See the original post:
Dock door (8945 J St #9) $603 1260sqft
Our K St building is block construction with 12′ ceiling and dock door. It is available July 1st. It has gas heat, 3 phase power, and a central air system in place
See the original post:
Dock door (8945 J St #9) $603 1260sqft